Gallery

Break-out panels complete on the Office Tower and Northernmost upper elevation of the Service Tower removed.

Roof level of the Service Tower looking South East.

ALL access points to the first floor have been barricaded. All barricades are mechanically fixed.

Exit point for material dropped via shaft to ground level into controlled receiving zone, which has been formed by part-removal of the first floor of the office tower.

 

Office Tower Roof Looking North

 

Office Tower Roof-top Housing

Office Tower with Roof removed, all perimeter Break-Out panels removed and ready for external frame to be split in each bay and T hinged over.

Comments are closed.