The Removal of the walkway leading from the podium block to Tayside House is now completely removed and the demolition of the podium block is well underway.
To facilitate the podium demolition we have had to temporary close the Pavement on Dockstreet Directly beside the block. We have Safedem personnel directing pedestrians and traffic. We expect the pavement to be reopened by 3.30 pm today.