Category Archives: Latest News
Overnight Working
Throughout the next few weeks there will be a series of overnight works taking place. Please see our Tayside House Demolition Leaflet for information on the works. We apologise for any inconvenience this may cause to you and thank you for … Continue reading
Road Closure
There will be a road closure on dock street at 8pm tonight (Tuesday the 29th May) to allow for the removal of the glazing to both bridges above the carriage way. The road will be reopened at 5.30am. We are … Continue reading
Visit to Glebelands Primary School
The Safedem Community Liaison Team visited Glebelands Primary School on Friday the 9th of March. The Team talked to the pupils about the demolition of Tayside House. The pupils listened carefully to the presentations that concentrated mainly on safety of … Continue reading
Pedestrian acces is re-instated at Shore Terrace
We would like to thank everyone for there co-operation during the ongoing works that are being carried out to the Podium Block. We have now re-instated the Shore Terrace Walkway.
Demolition Works and Road Closure
As you may have noticed the demolition works to the Podium Block are well underway. We will be undertaking additional works this Saturday the 10th of March and in order for us to carryout these works, there will be a lane closure … Continue reading
Walkway Demolition
Safedem have completed the works to lift down the Olympia Walkway in Dundee city centre. The works are part of the Tayside House project which includes the demolition of the 18 storey former council offices. The works have required detailed planning and … Continue reading
The Dismantiling and Removal of Tayside House – Olympia Walkway
The dismantling and removal of the walkway from Tayside House leading to the Olympia will be carried out next week! The Demolition will commence on Tuesday the 17th of January at 7.30pm and will be complete by Friday the 20th of January at 5.30am. … Continue reading
Demolition of Tayside House
Tayside House will be deconstructed using the Top Down Demolition Method. The Podium Block at the base of the tower will be demolished using conventional means. We are in the proccess of removing all asbestos materials from the block, this … Continue reading